Tool
Road conditions
How every Town road scored in the Town's 2023 pavement report, from Excellent to Deficient. Look up your street below.
- 562Town roads rated
- 78.4average score (PCI, out of 100)
- 187.3miles rated
- $40.5Mpaving backlog in the report
Roads by condition
Miles by condition
PCI is the Pavement Condition Index, a 0–100 score from field inspections in spring 2022. The score is for the whole street. A new pavement report is expected soon.
Find your street
562 roads. Page 7 of 12.
| Road | Score | Condition | Repair type | Miles | Type |
|---|---|---|---|---|---|
| LAMPLIGHTER LN | PCI 82.48 | Fair | Preventative Maintenance | 0.60 mi | Local |
| LANCASTER CROSSING | PCI 73 | Fair | Preventative Maintenance | 0.23 mi | Cul-de-sac or dead end |
| LANCASTER FARM RD | PCI 75.92 | Fair | Preventative Maintenance | 0.93 mi | Local |
| LANSING DR | PCI 55 | Deficient | Reclamation Local | 0.31 mi | Cul-de-sac or dead end |
| LAWRENCE RD | PCI 75.61 | Fair | Mill and Overlay | 3.38 mi | Collector |
| LAZARUS WAY | PCI 58.87 | Deficient | Reclamation Local | 0.45 mi | Local |
| LEE JOY LN | PCI 74 | Fair | Preventative Maintenance | 0.13 mi | Cul-de-sac or dead end |
| LEESIDE DR | PCI 90 | Good | Routine Maintenance | 0.04 mi | Cul-de-sac or dead end |
| LEMAY RD | PCI 93.99 | Excellent | Defer Maintenance | 0.30 mi | Local |
| LEONARD LN | PCI 71 | Poor | Mill and Overlay | 0.13 mi | Cul-de-sac or dead end |
| LIBERTY ST | PCI 93.99 | Excellent | Defer Maintenance | 0.51 mi | Collector |
| LINCOLN TER | PCI 94 | Excellent | Defer Maintenance | 0.35 mi | Local |
| LINDA ST | PCI 74.41 | Fair | Preventative Maintenance | 0.26 mi | Local |
| LINWOOD AVE | PCI 79.99 | Fair | Preventative Maintenance | 0.40 mi | Local |
| LISETTE DR | PCI 80 | Fair | Preventative Maintenance | 0.29 mi | Cul-de-sac or dead end |
| LOIS LN | PCI 85 | Good | Preventative Maintenance | 0.11 mi | Cul-de-sac or dead end |
| LONDON RD | PCI 40 | Deficient | Reclamation Local | 0.22 mi | Local |
| LONGWOOD RD | PCI 93.21 | Excellent | Defer Maintenance | 0.26 mi | Local |
| LOREN RD | PCI 71.99 | Poor | Mill and Overlay | 0.17 mi | Local |
| LOU AVE | PCI 61.08 | Poor | Mill and Overlay | 0.44 mi | Local |
| LOU-AL LN | PCI 65.13 | Poor | Mill and Overlay | 0.13 mi | Local |
| LOWELL RD | PCI 91.99 | Good | Routine Maintenance | 0.07 mi | Arterial |
| LUCILLE AVE | PCI 93.99 | Excellent | Defer Maintenance | 0.38 mi | Local |
| LYNDALE AVE | PCI 89.99 | Good | Routine Maintenance | 0.06 mi | Local |
| MACFARLAND RD | PCI 58.93 | Deficient | Reclamation Local | 0.14 mi | Local |
| MACGREGOR AVE | PCI 66.71 | Poor | Mill and Overlay | 0.23 mi | Local |
| MACLARNON RD | PCI 66.47 | Poor | Mill and Overlay | 0.40 mi | Local |
| MAGNOLIA AVE | PCI 79.99 | Fair | Preventative Maintenance | 0.12 mi | Local |
| MAIN ST | PCI 85.19 | Good | Preventative Maintenance | 2.35 mi | Collector |
| MAIN ST EXT | PCI 89.99 | Good | Routine Maintenance | 0.09 mi | Collector |
| MALL RD | PCI 84.99 | Fair | Preventative Maintenance | 0.70 mi | Collector |
| MANOR PKY | PCI 90.21 | Good | Routine Maintenance | 0.44 mi | Local |
| MAPLE PL | PCI 92 | Excellent | Routine Maintenance | 0.06 mi | Cul-de-sac or dead end |
| MARC ST | PCI 75 | Fair | Preventative Maintenance | 0.06 mi | Cul-de-sac or dead end |
| MARIANNA RD | PCI 89.99 | Good | Routine Maintenance | 0.63 mi | Local |
| MARIANNA RD EXT | PCI 93.99 | Excellent | Defer Maintenance | 0.06 mi | Local |
| MARIE AVE | PCI 89.15 | Good | Routine Maintenance | 0.26 mi | Local |
| MARONOS DR | PCI 73 | Fair | Preventative Maintenance | 0.12 mi | Cul-de-sac or dead end |
| MARSH AVE | PCI 84.99 | Fair | Preventative Maintenance | 0.36 mi | Local |
| MARTIN AVE | PCI 70 | Poor | Mill and Overlay | 0.19 mi | Cul-de-sac or dead end |
| MARY ANN AVE | PCI 68.59 | Poor | Mill and Overlay | 0.65 mi | Local |
| MARYS LN | PCI 79.09 | Fair | Preventative Maintenance | 0.14 mi | Local |
| MASCOMA RD | PCI 58.99 | Deficient | Reclamation Local | 0.10 mi | Local |
| MASON DR | PCI 72.62 | Fair | Preventative Maintenance | 0.32 mi | Local |
| MATTHEW DR | PCI 83.99 | Fair | Preventative Maintenance | 0.41 mi | Local |
| MATTHIAS ST | PCI 65.45 | Poor | Mill and Overlay | 0.44 mi | Cul-de-sac or dead end |
| MAYBERRY ST | PCI 74.99 | Fair | Preventative Maintenance | 0.10 mi | Local |
| MAYLANE DR | PCI 91.99 | Good | Routine Maintenance | 0.20 mi | Local |
| MCCORMICK WAY | PCI 80 | Fair | Preventative Maintenance | 0.10 mi | Cul-de-sac or dead end |
| MCGRATH ST | PCI 94 | Excellent | Defer Maintenance | 0.06 mi | Cul-de-sac or dead end |
Is a road in bad shape right now? Report a pothole or road problem.
About this data
Town of Salem Pavement Management Program Final Report (September 19, 2023), prepared by BETA Group, Inc., from spring 2022 field inspections. Scores use ASTM methods. The report covers Town-maintained roads only.
The report counts 183.94 miles of paved Town road, a paving backlog of $40,473,807, and 37.28 miles (about 1 mile in 5) of cul-de-sacs and dead ends. The road list on this page adds up to 187.3 miles. We have not yet matched that to the report’s 183.94-mile total.
Condition bands, by the score as the report records it (to two decimals): Excellent 92 and up, Good 85 to 91.99, Fair 72 to 84.99, Poor 60 to 71.99, Deficient below 60. The percentages in “Roads by condition” are shares of roads, not of miles.