Tool
Road conditions
How every Town road scored in the Town's 2023 pavement report, from Excellent to Deficient. Look up your street below.
- 562Town roads rated
- 78.4average score (PCI, out of 100)
- 187.3miles rated
- $40.5Mpaving backlog in the report
Roads by condition
Miles by condition
PCI is the Pavement Condition Index, a 0–100 score from field inspections in spring 2022. The score is for the whole street. A new pavement report is expected soon.
Find your street
562 roads. Page 4 of 12.
| Road | Score | Condition | Repair type | Miles | Type |
|---|---|---|---|---|---|
| DUNBAR TER | PCI 79.99 | Fair | Preventative Maintenance | 0.12 mi | Local |
| DURHAM ST | PCI 92 | Excellent | Routine Maintenance | 0.08 mi | Cul-de-sac or dead end |
| DUSTON RD | PCI 63.91 | Poor | Mill and Overlay | 0.60 mi | Local |
| DWIGHT AVE | PCI 46.87 | Deficient | Reclamation Local | 0.17 mi | Local |
| DYER AVE | PCI 73.81 | Fair | Preventative Maintenance | 0.50 mi | Local |
| DYSON DR | PCI 86.99 | Good | Routine Maintenance | 0.33 mi | Local |
| E BROADWAY | PCI 97.99 | Excellent | Defer Maintenance | 1.17 mi | Collector |
| EAGLE'S NEST RDG | PCI 82 | Fair | Preventative Maintenance | 0.30 mi | Cul-de-sac or dead end |
| EARL ST | PCI 97.99 | Excellent | Defer Maintenance | 0.05 mi | Local |
| EASY ST | PCI 95 | Excellent | Defer Maintenance | 0.07 mi | Cul-de-sac or dead end |
| EATON ST | PCI 83.99 | Fair | Preventative Maintenance | 0.08 mi | Local |
| EDMUNDS CIR | PCI 40 | Deficient | Reclamation Local | 0.06 mi | Cul-de-sac or dead end |
| EDWARDS ST | PCI 99.99 | Excellent | Defer Maintenance | 0.10 mi | Local |
| ELEANOR ST | PCI 89.99 | Good | Routine Maintenance | 0.10 mi | Local |
| ELIZABETH LN | PCI 100 | Excellent | Defer Maintenance | 0.30 mi | Cul-de-sac or dead end |
| ELLSMERE AVE | PCI 100 | Excellent | Defer Maintenance | 0.16 mi | Local |
| ELMWOOD AVE | PCI 74.03 | Fair | Preventative Maintenance | 0.52 mi | Local |
| ELSIE AVE | PCI 69.44 | Poor | Mill and Overlay | 0.13 mi | Local |
| EMERALD DR | PCI 71.34 | Poor | Mill and Overlay | 0.37 mi | Local |
| EMERSON WAY | PCI 71.01 | Poor | Mill and Overlay | 0.27 mi | Local |
| EMERY RD | PCI 94 | Excellent | Defer Maintenance | 0.13 mi | Cul-de-sac or dead end |
| EMILEO LN | PCI 45 | Deficient | Reclamation Local | 0.20 mi | Cul-de-sac or dead end |
| EMILEO LN EXT | PCI 63 | Poor | Mill and Overlay | 0.07 mi | Cul-de-sac or dead end |
| ENTERPRISE DR | PCI 72 | Fair | Mill and Overlay | 0.13 mi | Cul-de-sac or dead end |
| EQUESTRIAN RD | PCI 89.99 | Good | Routine Maintenance | 0.39 mi | Local |
| ERIN LN | PCI 95.99 | Excellent | Defer Maintenance | 0.24 mi | Local |
| ERMER RD | PCI 82.99 | Fair | Preventative Maintenance | 0.56 mi | Collector |
| EVERGREEN RD | PCI 72.99 | Fair | Preventative Maintenance | 0.09 mi | Local |
| EWINS LN | PCI 90 | Good | Routine Maintenance | 0.05 mi | Cul-de-sac or dead end |
| EYSSI DR | PCI 90 | Good | Routine Maintenance | 0.07 mi | Cul-de-sac or dead end |
| FAIRMONT RD | PCI 91.99 | Good | Routine Maintenance | 0.07 mi | Local |
| FIEDLER AVE | PCI 91.99 | Good | Routine Maintenance | 0.08 mi | Local |
| FIELD AVE | PCI 89.99 | Good | Routine Maintenance | 0.16 mi | Local |
| FIELDSTONE LN | PCI 65.99 | Poor | Mill and Overlay | 0.12 mi | Local |
| FIR ST | PCI 94 | Excellent | Defer Maintenance | 0.04 mi | Cul-de-sac or dead end |
| FIRST ST | PCI 89.99 | Good | Routine Maintenance | 0.05 mi | Local |
| FISHER DR | PCI 65 | Poor | Mill and Overlay | 0.19 mi | Cul-de-sac or dead end |
| FLINTLOCK RD | PCI 89.99 | Good | Routine Maintenance | 0.55 mi | Local |
| FLORAL AVE | PCI 88.99 | Good | Routine Maintenance | 0.13 mi | Local |
| FLORENCE AVE | PCI 89.99 | Good | Routine Maintenance | 0.05 mi | Local |
| FOURTH ST | PCI 64.99 | Poor | Mill and Overlay | 0.09 mi | Local |
| FOX RUN LN | PCI 93.99 | Excellent | Defer Maintenance | 0.37 mi | Local |
| FRANCIS ST | PCI 97.99 | Excellent | Defer Maintenance | 0.09 mi | Local |
| FRANKLIN ST | PCI 97.99 | Excellent | Defer Maintenance | 0.22 mi | Local |
| FRANZ RD | PCI 72.99 | Fair | Preventative Maintenance | 0.09 mi | Local |
| FRARY ST | PCI 99.99 | Excellent | Defer Maintenance | 0.09 mi | Local |
| FRASER DR | PCI 72.99 | Fair | Preventative Maintenance | 0.54 mi | Local |
| FREEDOM DR | PCI 86 | Good | Routine Maintenance | 0.11 mi | Cul-de-sac or dead end |
| FREEMAN LN | PCI 15 | Deficient | Reclamation Local | 0.04 mi | Cul-de-sac or dead end |
| GAIL RD | PCI 90 | Good | Routine Maintenance | 0.09 mi | Cul-de-sac or dead end |
Is a road in bad shape right now? Report a pothole or road problem.
About this data
Town of Salem Pavement Management Program Final Report (September 19, 2023), prepared by BETA Group, Inc., from spring 2022 field inspections. Scores use ASTM methods. The report covers Town-maintained roads only.
The report counts 183.94 miles of paved Town road, a paving backlog of $40,473,807, and 37.28 miles (about 1 mile in 5) of cul-de-sacs and dead ends. The road list on this page adds up to 187.3 miles. We have not yet matched that to the report’s 183.94-mile total.
Condition bands, by the score as the report records it (to two decimals): Excellent 92 and up, Good 85 to 91.99, Fair 72 to 84.99, Poor 60 to 71.99, Deficient below 60. The percentages in “Roads by condition” are shares of roads, not of miles.