Tool
Road conditions
How every Town road scored in the Town's 2023 pavement report, from Excellent to Deficient. Look up your street below.
- 562Town roads rated
- 78.4average score (PCI, out of 100)
- 187.3miles rated
- $40.5Mpaving backlog in the report
Roads by condition
Miles by condition
PCI is the Pavement Condition Index, a 0–100 score from field inspections in spring 2022. The score is for the whole street. A new pavement report is expected soon.
Find your street
562 roads. Page 11 of 12.
| Road | Score | Condition | Repair type | Miles | Type |
|---|---|---|---|---|---|
| SYLVAN DR | PCI 90.21 | Good | Routine Maintenance | 0.18 mi | Local |
| SYLVAN DR EXT | PCI 84 | Fair | Preventative Maintenance | 0.25 mi | Cul-de-sac or dead end |
| TAMMY ST | PCI 72.99 | Fair | Preventative Maintenance | 0.23 mi | Local |
| TAYLOR ST | PCI 84.99 | Fair | Preventative Maintenance | 0.38 mi | Local |
| TEAGUE DR | PCI 61.88 | Poor | Mill and Overlay | 0.78 mi | Local |
| THEODORE AVE | PCI 75 | Fair | Preventative Maintenance | 0.21 mi | Cul-de-sac or dead end |
| THERESA AVE | PCI 94 | Excellent | Defer Maintenance | 0.50 mi | Local |
| THERESE RD | PCI 79.99 | Fair | Preventative Maintenance | 0.12 mi | Local |
| THERIAULT AVE | PCI 90 | Good | Routine Maintenance | 0.17 mi | Cul-de-sac or dead end |
| THIRD ST | PCI 34.99 | Deficient | Reclamation Local | 0.09 mi | Local |
| THOMAS DR | PCI 95 | Excellent | Defer Maintenance | 0.17 mi | Cul-de-sac or dead end |
| TICKLEFANCY LN | PCI 77.58 | Fair | Preventative Maintenance | 0.80 mi | Local |
| TILTON TER | PCI 100 | Excellent | Defer Maintenance | 0.12 mi | Cul-de-sac or dead end |
| TIMOTHY LN | PCI 76.99 | Fair | Preventative Maintenance | 0.23 mi | Local |
| TOWN FARM RD | PCI 93.99 | Excellent | Defer Maintenance | 0.84 mi | Collector |
| TOWNSEND AVE | PCI 82.19 | Fair | Preventative Maintenance | 0.76 mi | Local |
| TREY CIR | PCI 94 | Excellent | Defer Maintenance | 0.11 mi | Cul-de-sac or dead end |
| TRINA RD | PCI 87.99 | Good | Routine Maintenance | 0.11 mi | Local |
| TROLLEY LN | PCI 73.33 | Fair | Preventative Maintenance | 0.24 mi | Local |
| TUDOR DR | PCI 74 | Fair | Preventative Maintenance | 0.14 mi | Cul-de-sac or dead end |
| TWINBROOK AVE | PCI 93.99 | Excellent | Defer Maintenance | 0.42 mi | Local |
| TYLER ST | PCI 83.99 | Fair | Preventative Maintenance | 0.36 mi | Local |
| UNION ST | PCI 40 | Deficient | Reclamation Local | 0.11 mi | Cul-de-sac or dead end |
| UNNAMED RD | PCI 64 | Poor | Mill and Overlay | 0.08 mi | Cul-de-sac or dead end |
| VALESKA LN | PCI 50 | Deficient | Reclamation Local | 0.10 mi | Cul-de-sac or dead end |
| VERONICA AVE | PCI 93.99 | Excellent | Defer Maintenance | 0.37 mi | Local |
| VETERANS MEMORIAL PKY | PCI 71.51 | Poor | Mill and Overlay | 1.14 mi | Collector |
| W DUSTON RD | PCI 94.99 | Excellent | Defer Maintenance | 0.32 mi | Local |
| WALDRON RD | PCI 63.99 | Poor | Mill and Overlay | 0.12 mi | Local |
| WALNUT TER | PCI 85 | Good | Preventative Maintenance | 0.14 mi | Cul-de-sac or dead end |
| WALTER PALMER LN | PCI 90 | Good | Routine Maintenance | 0.16 mi | Cul-de-sac or dead end |
| WARREN AVE | PCI 66 | Poor | Mill and Overlay | 0.05 mi | Cul-de-sac or dead end |
| WEBB ST | PCI 100 | Excellent | Defer Maintenance | 0.10 mi | Cul-de-sac or dead end |
| WEBSTER ST | PCI 77 | Fair | Preventative Maintenance | 0.20 mi | Cul-de-sac or dead end |
| WEINHOLD CIR | PCI 73 | Fair | Preventative Maintenance | 0.10 mi | Cul-de-sac or dead end |
| WELLS AVE | PCI 61.99 | Poor | Mill and Overlay | 0.15 mi | Local |
| WELLS RD | PCI 73 | Fair | Preventative Maintenance | 0.06 mi | Cul-de-sac or dead end |
| WELSH CIR | PCI 80 | Fair | Preventative Maintenance | 0.06 mi | Cul-de-sac or dead end |
| WESLEY LN | PCI 94 | Excellent | Defer Maintenance | 0.23 mi | Cul-de-sac or dead end |
| WEST LN | PCI 85 | Good | Preventative Maintenance | 0.04 mi | Cul-de-sac or dead end |
| WEST SIDE DR | PCI 85.99 | Good | Routine Maintenance | 0.01 mi | Local |
| WEST ST | PCI 97.99 | Excellent | Defer Maintenance | 0.22 mi | Local |
| WESTCHESTER ST | PCI 97.99 | Excellent | Defer Maintenance | 0.13 mi | Local |
| WESTERDALE AVE | PCI 99.99 | Excellent | Defer Maintenance | 0.08 mi | Local |
| WHEELER AVE | PCI 84.5 | Fair | Preventative Maintenance | 1.06 mi | Collector |
| WHEELER DAM RD | PCI 71.33 | Poor | Mill and Overlay | 0.45 mi | Local |
| WHITENECK WAY | PCI 76 | Fair | Preventative Maintenance | 0.22 mi | Cul-de-sac or dead end |
| WILDFLOWER LN | PCI 94 | Excellent | Defer Maintenance | 0.11 mi | Cul-de-sac or dead end |
| WILDWOOD LN | PCI 95.99 | Excellent | Defer Maintenance | 0.18 mi | Local |
| WILLIAMS ST | PCI 74.97 | Fair | Preventative Maintenance | 0.31 mi | Local |
Is a road in bad shape right now? Report a pothole or road problem.
About this data
Town of Salem Pavement Management Program Final Report (September 19, 2023), prepared by BETA Group, Inc., from spring 2022 field inspections. Scores use ASTM methods. The report covers Town-maintained roads only.
The report counts 183.94 miles of paved Town road, a paving backlog of $40,473,807, and 37.28 miles (about 1 mile in 5) of cul-de-sacs and dead ends. The road list on this page adds up to 187.3 miles. We have not yet matched that to the report’s 183.94-mile total.
Condition bands, by the score as the report records it (to two decimals): Excellent 92 and up, Good 85 to 91.99, Fair 72 to 84.99, Poor 60 to 71.99, Deficient below 60. The percentages in “Roads by condition” are shares of roads, not of miles.